With 6 different patents, Fireline® 520 gives you the protection you need for your buildings with, easy to install, consistent, protection features
Pre-attached flanges drastically reduce labour cost and ensure uniform installation
Sections come with factory made male to female splices, eliminating the need for complex field manipulation at seams (see image below)
Mounting configurations available for both wall and floor conditions:
Top (flush) mount
Low Profile (recessed) mount
Bottom Mount
Factory fabricated horizontal and vertical transitions ensure the fire rating requirements of UL 2079 are not compromised – details & directions for field fabricated transitions also available
Water Guard® Series fire blankets are available to protect the blanket system and fire rating during and after construction of open structures such as parking facilities and stadiums. (Optional drain tubes available)
Product specification
Formerly known as the 975 Fire Blanket Expansion Joint System
1, 2, 3 and 4 hour rated systems available
Tested in accordance with: – UL 2079/ ULC S-115 “FTH” (FTH: Rating Fire, Temperature and Hose) -ASTM-E119/E1399/E1966